Laserfiche WebLink
EXHIBIT G: WATER INFORMATION <br /> <br /> <br />The site plan map shows the location of existing water <br />courses near the Vagneur Pit. A well will be constructed <br />at the northeast corner of the site adjacent to Woody Creek. <br />Water rights will be purchased as defined in the attached <br />lease and option agreements; i.e., one cubic foot per second <br />from the Waco Ditch and .41 cubic feet per second from. <br />Collins Creek. Such water rights will safeguard our well <br />water use. Storage ponds will be built on the site and <br />water recycled for air pollution control purposes. All <br />water used on site will be contained on site via drainage <br />ditches and storage ponds. Our anticipated use of water is <br />as follows: <br />Dust control 32,000 gallons/day <br />Pond evaporation 680 gallons/day <br />Water removed from site in <br />washed material (sand) 11,628 gallons/day <br />TOTAL 44,308 gallons/day <br />Easily attainable from the water rights in excess of <br />900,000 GA/Day, this relatively small amount of water usage <br />is not expected to have any noticeable affect on the <br />hydrologic balance of the area. <br /> <br />