Laserfiche WebLink
-3- <br />b) The Board will erter the lands to perform reclamation only if the Board has <br />determured: <br />not bear performed, and <br />i. that reclamation regruted by law to have beer performed upon such lands has <br />ii. that furancial warranty forfeiture proceedings described in the Act or similar <br />provisiaars of subsequern laws, if any, have bear initiated. <br />c) The Division, acting for the Board, will eater lands to respond to an emergarcy only <br />where the Division determines that any ofthe conditions of Construction Material Rule 8.4.2. exist. <br />~ The additional conditions set forth in the attached rider, if any, are incorporated herein by <br />referarce. <br />/_/ a) Rider is attached. <br />/ XX / b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DE~PA~RT~ME~NT OF NATURAL RESOURCES <br />RONALD W. CATTANY / <br />Acting Division Director <br />