Laserfiche WebLink
[NOIN[[[• ANp CONTNACTO[[ <br />LIVELY MANL~FACTUgING AND EC~JJPMENT <br />`~~ ~ ~~jj~/ v. o Box 3a5 <br />- GLEN WHITE. r'E51 VIBGINiR PSB.9 <br />' TELEPHONE ]0./1567600 <br />November 6, 1984 <br />Mr. Melvin W. Madrid <br />Colorado Westmoreland, Inc. <br />P.0. Box E <br />Paonia, CO 81428 <br />Subject: Budget Estimates <br />Our P83-155-Revised <br />Dear Melvin: <br />This letter is a confirmation of our discussions of November 5 and November 6, <br />1984, concerning John Shuaate's letter of June 12, 1984. <br />You had requested cost breakdowns for the site preparation Work required for <br />the construction of a truck dump and conveying systens at your Orchard Valley <br />facility. These breakdowns are as follows: <br />Excavation (Conveyers and Haul <br />• Excavation (T1-uck Dump area) <br />Engineered Backfill (all areas) <br />Spoil disposal (all areas) <br />Clearing and Grubbing <br />Seeding (all areas) <br />Road Surfacing <br />Roads) $10.00 per cubic yard <br />$6.00 per cubic yard <br />$20.00 per cubic yard <br />$3.00 per cubic yard <br />$2,800.00 per acre <br />$1,100.00 per acre <br />$5.00 per square yard <br />You had also requested the cost for steel cable belting and the projected <br />construction time for the proposed Work. <br />The cost for the steel cable belting for the long Conveyor Wes $507,500.00 <br />(17,500 feet @$29.00 per foot), the Short Corneyor belting Was $188,500.00 <br />(6,500 feet @ $29.00 per foot). <br />the projected duration of construction would be 18 months for work beginning <br />with the site preparation through facilities start-up. This duration would <br />depend upon being able to work on conveyor erection while the site preparation <br />continues in other areas. <br />~ November 6, you requested the cost breakdown for adding a record truck dump <br />and emergency storage. the breakdown for adding the second 11-uck Ihmp, Cover <br />over two Truck Amps, and a Conveyor for emergency storage Was $275,000.00. <br />• <br />