Laserfiche WebLink
[N GIN [[R• AND CONTRACTOR[ <br />LIVELY MANUFACTUF~ING AND Et~PMENT <br />• '°"~~ <br />Mr. Melvin W. Madril <br />June 12, 1984 <br />Page 2 <br />Item li 3 - Short Conveyor - Low Profile <br />Truck Dump <br />Revised Excavation 30,340 cubic yards <br />Revised Backfill 27,340 cubic yards <br />Spoil 3,000 cubic yards <br />Add second truck dump <br />Add building over both truck dumps <br />Add com ^yor for emergency storage <br />Remainder of Conveyor <br />Revised Excavation 28,400 cubic yards <br />Revised Backfill 9,900 cubic yards <br />Spoil 18,500 cubic yards <br />10'-0 diameter culvert 430 lineal feet <br />Clearing and grubbing 1.6 acres <br />Add access road 12' wide x 3000' long <br />Crossing of farmers' road <br />Crossing of canal <br />Crossing of Highway 133 <br />• Add for steel cable belting <br />Total Additional Price $1,920,000.00 <br />Item 71 4 - Short Conveyor - High Profile <br />Truck Dump <br />Revised Excavation 30,340 cubic yards <br />Revised &ackfill 27,340 cubic yards <br />Spoil 3,000 cubic yards <br />Add second truck dump <br />Add cover over both truck dumps <br />Add conveyor for emergency storage <br />Remainder of Conveyor <br />Revised Excavation 4,300 cubic yards <br />Spoil 4,300 cubic yards <br />Add access road 12' wide x 3,160' long <br />Clearing and grubbing 1 acre <br />Add for steel cable belting <br />Total Additional Price $1,290,000.00 <br />The above quantities and prices are approximate and should not be used for firm <br />pricing or construction. <br />C1 <br />