Laserfiche WebLink
<br />Exhibit I1 2 <br />Page 2 <br />This conveyor will travel along the path as shown on Colorado <br />Westmoreland Inc. drawings D01G0165, DO1G0166, and D01G0167. <br />The profile of this conveyor is shown on Lively Manufacturing <br />and Equipment Company drawing P83-155-u. <br />The estimate amount of escavation (by others) and suitable <br />backfill (by others) is as follows: <br />Escavation - Approximately 21,000 cubic yards (includes <br />Truck Dump) <br />Backfill - Approximately 11,950 cubic yards <br />The Budget Estimate for the 42" Short Conveyor-Low Profile is <br />Two Million One Hundred Ten Thousand Dollars ($2,110,000.00). <br />• <br />If the Long Conveyor is installed deduct Three Hundred Sixty <br />Thousand Dollars ($360,000.00) for the Truck Dump and approx- <br />imately 500 feet of conveyor. (Short Conveyor) <br />NOTE: Considerable savings can be realized with this <br />scheme if the length of 12' diameter corrugated <br />pipe is reduced to only that amount required <br />under the Farmers 14ine Road, Canal and Canal Road <br />and Highway 133 and an open trench concept being <br />used between these roads. <br />u <br />