Laserfiche WebLink
Doc Date:12/11/2001 III IIIIII~III~II III <br />II sss <br />• <br />~J <br /> <br />~I~ 4.22 CONCURRENT SURFACE AND UNDERGROUND MINING <br />As noted, in Section 2.06.1, Variances for Delay in Contemporaneous <br />Reclamation Requirements in Combined Surface and Underground Mining <br />Operations, EFCI does not currently, and has no plans to, conduct surface <br />mining operations. Current plans call for the Southfield coal reserve to <br />be recovered exclusively by underground mining methods. Therefore, <br />concurrent surface and underground mining operations will not occur on the <br />Southfield property, and the requirements of this section are not <br />applicable. <br />4.22-1 <br />