Laserfiche WebLink
~II IIIII~II~II~~ II~ <br />DITCH CxOSSING AGREEMENT ~~ ~~ <br />THIS AGREEMENT, is made this ~ day of , 1994, <br />between Southdown,.Inc., a Louisiana corporation, (hereinafter <br />termed "Southdown"), and The Supply irrigating Ditch Company, a <br />Colorado corporation, (hereinafter termed "the Ditch Company"). <br />W I T N E S S E T H <br />Southdown wishes to construct a box culvert, bridge, and <br />pumping station across the Supply Ditch ("Ditch"). The crossing <br />will be located in the W1/2 of the N1/2 of the NE1/4 of Section 21, <br />Township 3 North, Range 70 West, of the 6th P.M. <br />NOW THEREFORE, it is mutually agreed as follows: <br />1. FACILITIES. The Ditch Company consents to Southdown's <br />installation, operation, and maintenance of the box culvert, <br />bridge, and adjacent pumping station within the Ditch and adjacent <br />twenty (20) feet. <br />2. DEBRIS AND POLLUTION. Southdown shall prevent any <br />pollutants, including but not limited to, trash, debris, and <br />construction material, from entering the Ditch and Ditch Easement <br />from the construction, operation, and maintenance of the box <br />culvert, bridge, and pumping station.. <br />3. PLANS AND SPECIFICATIONS. Southdown shall be <br />responsible for construction of said box culvert, bridge, and <br />pumping station and the operation and maintenance thereof in a <br />good, safe, and workmanlike manner, according to plans and <br />specifications approved and initialed by the Ditch Company's <br />engineers._'Southdown agrees to gay the pitch Company $1,000.00 for <br />crossing fees, and further to reimburse the Ditch Company for its <br />reasonable attorneys' and engineering fees for preparation of this <br />Agreement and review of the plans and specifications, upon <br />execution thereof. <br />4. LIABILITY. Southdown will construct, operate, and <br />maintain this box culvert, bridge, and pumping station in a manner <br />which will not interfere with irrigation water and flow in the <br />Ditch. Southdown shall indemnify and hold the Ditch Company <br />harmless from any loss or damage, to persons or property, arising <br />out of the negligent construction, operation, maintenance, and <br />usage of the box culvert, bridge, and pumping station, including <br />attorneys' and engineering fees and costs, except to the extent of <br />the Ditch Company's own negligence or that of its employees and <br />agents. Southdown will be liable for any and all loss or damage to <br />the Ditch Company or its shareholders caused by or related to the <br />negligent planning, construction, operation, maintenance and use of <br />said box culvert, bridge, and pumping station, except to the extent <br />of the Company`s own negligence or that of its employees and <br />agents. By virtue of entering into this Agreement, the Ditch <br />Company assumes no liability or responsibility for the <br />