My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE108168
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE108168
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:00:37 PM
Creation date
11/24/2007 4:22:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004048
IBM Index Class Name
Permit File
Doc Date
7/26/2004
Doc Name
Supplemental Information
From
Robert Daugherty
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECFiv~D <br />1UL 2 6 2004 <br />Division of Minerals end Geology <br />value of materials removed in the previous month. Payment must be made by the 15'" day following [he end of [he month for <br />which you are reporting. You must pay the [oral purchase price not later than 60 days before the contract expires. <br />(c) The United States will retain the first installment as security for your full and faithful performance and will apply it to the last <br />installment required to make the total payment equal to the total price given in section 2. <br />The total purchase price equals the sum of the total quantities removed, multiplied by their respective unit prices. <br />If you are late making an installment payment, you must not remove any more material until you have paid. Removing <br />material you have not paid for is trespass, and for trespass you must pay at triple the appraised unit price, or at triple the <br />reappraised unit price if BLM has made a reappraisal. To resume removal operations after you were late making payments, you <br />must obtain BLM's written approval. <br />(d) You receive title to the mineral materials only after you have paid for them and extracted them. <br />Sec. 4. Risk of loss. You assume complete risk of loss for all materials to which you have title. If material covered by this <br />contract is damaged or destroyed before title passes, you are liable for all loss suffered if you or your agents are directly or <br />indirectly responsible for the damages. If you are not responsible for the damage or destruction, you are liable only to the extent <br />that the loss was caused by your failure to remove the material under the terms of this contract. You are still liable for breach of <br />contract or any wrongful or negligent act. <br />Sec. 5. Liability jot damage to materials not sofd to you. You are liable for loss or damage to materials not sold to you if you <br />or your agents are directly or indirectly responsible for the damage or loss. You are also liable if you fail to perform under the <br />contract according to BLM's instructions and the United States incurs costs resulting from your breach of any contract term or <br />your failure to use proper conservation practices. If the damage resulted from willful or gross negligence, you are liable for triple <br />[he appraised value of the damaged or destroyed materials. If the damage or destruction did not result from willful or gross <br />negligence, you are liable for lesser charges, but not less than the appraised value of the materials. <br />Sec. 6. Stipulations and reserved terms. Your rights are subject to the regulations at 43 CFR Group 3600 and to any stipulations <br />and the mining plan attached to this contract. <br />I / J BLM will check this box if there are stipulations attached to this contract. <br />Sec. 7. Notice ojoperarions. You must notify BLM immediately when you begin and end operations under this contract If <br />BLM has specified a time frame (or notification, you must comply with that time frame. <br />Sec. 8. Bonds. (a) You must fumish BLM with a bond in the amount of 53,000.00 as a condition of issuing this contract. <br />(b) If you do no[ perform all terms of the contract, BLM will deduct an amount equal to the damages from the face amount of [he <br />bond. If the damages exceed the amount of the bond, you are liable for the excess. BLM will cancel the bond or return the cash <br />or U.S. bonds you supplied when you have completed performance under this contract. <br />(c) BLM will require a new bond when it finds any bond you fumish under this contract to be unsatisfactory. <br />Sec. 9. Assignments. You may not assign this contract without BLM's written approval. <br />Sec. ] 0. Modification o(the Approved Mining or Reclamation Plan. You or BLM may initiate modification of these plans to <br />adjust for changed conditions, or to cortect any oversight. The conditions for BLM requiring you to modify thcse plans, or <br />approving your request for modification are found in the regulations at 43 CFR 3601.44. <br />Sec. 11. Espiration ojcontract. This contract will expire 5 years, 0 months, 0 days from its approval date, unless BLM <br />extends the term or renews the contract. <br />J ~ BLM will check this box if this contract is a renewable competitive contract. <br />Sec. 12. Renewal of renewable competitive contract. BLM will renew your contract if you apply in writing no less than 90 days <br />before your renewable competitive contract expires and you meet the conditions in the regulations at 43 CFR 3602.47. <br />Sec. 13. Violationr, and cancellations. (a) If you violate any terms or provisions of this contract, BLM may cancel your contract <br />following the regulations at 43 CFR 3601.60 et seq., and recover all damages suffered by the United States, including applying <br />any advance payments you made under this contract toward the payment of the damages. <br />
The URL can be used to link to this page
Your browser does not support the video tag.