My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE108167
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE108167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:00:37 PM
Creation date
11/24/2007 4:21:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/16/2003
Section_Exhibit Name
NH2 Section 2.05.4(2)(c) Backfilling and Grading
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ' <br />Channel Factor Channel AA-AA <br />Q 31.38 cfs <br />Z (side slopes) 10:1 <br />Shape Trapezoidal <br />n 0.030 <br />Limiting Velocity 5.0 fps <br />Slope 0.0413 ft/ft <br />Results <br />Normal Depth (dn) 0.37 ft <br />Ffow velocity 4.58 fps <br />Channel width 15 ft <br />Results <br />Based on the above results, the reclaimed drainage channel will have a minimal width of 15 feet and <br />• gently sloping sides. The bottom will be relatively flat with minute channeling. Added rock maybe placed <br />for energy dissipation. A trapezoidal channel with a minimum bottom width of 15 feet and 10h:1v orflatter <br />side slopes and no free board simulates this condition. The actual width will vary from 15 feet up to 100+ <br />feet. This typical cross section or one with the same or larger cross sectional area, will be used for the <br />entire channel reach. This will insure that the velocity will be below the limiting velocity of 5.0 fps, since <br />the peak flow was determined at the downstream end of the reclaimed drainage channel. No free board <br />was calculated because minimal, if any damage will occur if the flow does leave the banks for short <br />periods of time. <br />The reclaimed drainage channel will be topsoiled and revegetated according to Section 2.05.4(2)(d) and <br />(e). <br />ATTACHMENT 2.05.4(2)(c) - 1-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.