(i) Reclamation Timetable <br />Timing and locations of topsoil removal and replacement within the upper refuse disposal and the <br />facilities site are shown on Map 57 and Map 56. It is uncertain at this time however, when (or if) <br />the upper refuse disposal site will be constructed. The timing of topsoil removal and replacement <br />within the lower waste coal disposal site is described in Exhibit 51. <br />Reclamation of the Refuse Pile Expansion disposal area will begin promptly as each phase of <br />deposition of the refuse coal is completed and will follow the procedures described in the <br />Reclamation Methodology Section and in Exhibit 50 and Exhibit 51. The Lower Refuse Pile will <br />be used as a storage area and will be reclaimed when no longer required for a storage area. <br />Refuse pile compaction and stabilization, topsoil replacement, and revegetation will occur as <br />portions of the refuse disposal areas aze completed. Disposal in the designated areas are also <br />discussed in the Reclamation Methodology Section, Exhibit 50, and Exhibit 51. <br />The surface facilities site and other disturbed areas at the West Elk Mine will be reclaimed as <br />described in the Reclamation Methodology Section. Permanent reclamation of operational areas <br />will not commence until actual mine operations cease, in approximately 40 years. Table 41A <br />provides a timetable for the major reclamation tasks, other than reclamation of the refuse piles. <br />Removal of the sedimentation ponds is not included, as they will not be removed until vegetation <br />has been established following completion of the major reclamation tasks. <br />Table 41A Time Table for Major Reclamation Tasks <br /> <br />RECLAMATION TASKS APPROXI114ATE TIME TO COMPLETE TASK <br />MAIN MINE SITE <br />Remove buildin s/strucrures 16 Weeks* <br />Backfill mine rtals & S lvester Gulch Fan Portal 12 Weeks* <br />Backfill and Grade 16 Weeks <br />Re lace to soil 8 Weeks <br />Seed 2 Weeks <br />LONE PINE GULCH <br />Remove buildin s/strucrures 6 Weeks <br />Backfill fan ovals 4 Weeks <br />Backfill and Grade 6 Weeks <br />Re lace to soil 3 Weeks <br />Seed 2 Weeks <br />NORTH SOIL STORAGE AREA <br />Backfill and Grade 6 Weeks <br />Re lace to soil 3 Weeks <br />Seed 1 Week <br />SYLVESTER GULCH FACILITIES AREA <br />Remove buildin s/strucrures 12 Weeks <br />Seal shafts #1, #2, and #3 12 Weeks <br />Backfill and Grade 16 Weeks <br />Re lace to soil 14 Weeks <br />Seed 3 Weeks <br />* Tasks could occur concurrently <br />2.05-88 Revised Dec. 7997 MR208; Revised Jun. 1999 TR90 <br />i <br />4 L~ Revised May 2003 MR-294 <br />