Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Agenry or organization name : DMG <br /> <br />TaskB: 001 Slate:Colomdo PemniflobM:M-2000-080 <br />Date: 1Qr31/2000 County ;Arapahoe Abbreviation :none <br />User: CLK Site:Pioneer Sand Filename:M050-002 <br /> <br />Pemlit or other job action :New Permit <br /> <br />Task description : Glede Sife <br /> <br />HOURLY EQUIPMENT COST Basic machine :Cal D8N (1996) Horsepower : 285 <br />Blade NPe :Semi-Universal <br />Attachment no. 1 : HOPS Cab Shih basis : 1 per day <br />Attachment no.2:NA <br /> Utilization % Cost tlata source : (CRG) <br />Cost Breakdown: Ownership cosUhour: $35.17 NA <br />Operating cosUhour: $55.64 100 <br />Ripper op. cosVhour : $0.00 NA <br />Operator cosVhour: $23 12 NA <br />Total unrt cosVhour: $113.93 Total fleet cosUhour: $227.86 <br />MATERIAL QUANTITIES <br />Inikal Swell <br />volume: I1,7f1 CCY factor: <br />Source of quantity lake-oN :Map C <br />Soume of est. swell factor :Cat Handbook <br />Loose <br />1. i25 volume: 12,500 LCV <br />Average push distance : 100 feet <br />Unadjusted hourly production : 803 LCYIhr <br />Material consistency description <br />Compacted lilt or embankmen( <br />Average push gradient : 8.00 °; (neg) <br />Average site altitude : 4,800 feet <br />Material weight : 2.550 Ibs/LCV <br />Material weigh) tlescdption <br />Earth -Dry packed <br />JOB TIME AND COST <br />Fleet size; 2 Dozers) <br />Umt cost: $0.264 /LCV <br /> <br />Opeator skill: <br />0.75 Soume <br />(avg.) <br />Matedal consistency : 0.90 (Cal HB <br />Dozing method : 1.00 (gen.) <br />Visibility: I.00 (avg.) <br />Job efficiency: 0.83 (1shi11/da <br />Spoil pile: 0.90 (ssd-!c, <br />Push gradient : 1.18 (Cat HB <br />Altitude: 1.00 (Cal HB <br />Material weight: 0.90 (Cal HB <br />Blade Npe : 1.00 (S or U, <br />Net correction : 0.54 <br />Adlusted unit production : 431.50 LCV/hr <br />Adjusted fleetpmducbon: 863.61 LCV/hr <br />Total job time: 14.47 Hours <br />Total job cost: $3,296 <br />