Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />EXHIFIT L <br />FEL'LAMATION COSTS <br />----------- ----- <br />Costs of reclamation are as follows: <br />Major disturbance - acres <br />bacl:filling with bulldozer ;: slope <br />4.31560_yds_'/acre .. ~Si~ .. 1 = X2178/acre <br />5~>i~ yd~/doper/dower-hr dozer hr ?. <br />Topsoil and gravel stoc4::piles are located on <br />previously disturbed land: <br />2 acres @ X2178/acre = ~ 4,56.~?~i <br />Moderate disturbance - 4 acres <br />Grading <br />~9~~/hr ;, 1.29 shifts/acre ;, 1~! hr shift <br />9l~ ` 1.29 >; lei = 'bl.lol/acre <br />4 acres @ $1,161 = ~ 4,644.1>~~ <br />Minor disturbance - 12 acres <br />S00 seedling trees/acre @ 3101i/1~~V0 <br />,=,~i(~_x li~~i = 35ii/acre <br />l~i~iii <br />Seeding = ~~~C>/acre <br />12 acres ~? ~=51~ _ $4, 2iii>, p~~ <br />Total Cost ?: Suggested Bond = ~11,~~22.~>~~ <br />'~ 1 <br />