Laserfiche WebLink
1 <br /> <br /> <br /> <br /> <br />1 <br /> <br /> <br /> <br /> <br />1 <br /> <br /> <br />1 <br />1 <br />1 <br />1 <br /> <br /> <br />EXHIBIT L <br />RECLAMATION COSTS <br />The two consecutive phases requiring the greatest <br />amount of reclamation work are Pleases I and II (5.39 acres + <br />of bank slope grading, and 27.23 acres + of revegetation). <br />Costs of reclaiming the area disturbed in Phases I and II <br />have been estimated based on the following data: <br />1. Grass seed mixture, 10.3 lbs./ac @ $2.27/lb. $ 23.40 <br />Fertilizer mixture, 100 lbs. AgriCliem (N ) <br />(18-46-0) @ $9.60/100 lbs., and 80 lbsz <br />AgriChem (P205) (34-0-0) @ $5.80 15.40 <br />1<lulch (straw), 66 bales/ac. @ $U.70/bale 46.20 <br />Labor, 16 man hrs/ac @ $6.00/hr. 96.00 <br />Per acre total $181.00 E-- <br />2. Seed mixture drilling and mulch crimping, <br />labor, 1.00 hrs/ac @ $40.00/hr. 40.00 <br />3. Back filling, slope grading and reshaping, ~ <br />2 hrs/ac @ $50.00/hr. 100.00 , <br />Thus, reclamation costs for the combined acreage in <br />Phases I and II are as follows: <br />Revegetation, 27.23 ac. @ $181.00/ac. <br />Seed mixture drilling and mulch crimping, <br />27.23 ac. @ $40.00/ac <br />Back filling, slope grading and reshaping, <br />5.39 ac. @ $100.00/ac. <br />TOTAL RECLAMATION COSTS, PHASES I AND II <br />Suggest bond be set at $6,600.00. <br />$4,928.63 <br />1,089.20 <br />539.00 <br />$6,556.83 <br />27 <br />