My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE107974
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE107974
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:00:26 PM
Creation date
11/24/2007 4:05:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
SEDIMENTATION STRUCTURE 006 PHASE II AS-BUILT
Section_Exhibit Name
TAB 13 ATTACHMENT 13-4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Mileage: 1 Rouurl <br />'trip <br />PROJECT: Seneca Pond 006, Ilaul Road A DATK: J/2II/f39 <br />LOCATION: Seneca W II Mine, Hoyden, CO T1Mf:: 2.5 hours <br />CLIENT: Peabody Coal Co. ENGR./TGC[1NICIAN: SJM <br />WORK PERrORMIsD: <br />Seneca Mine had completed the excavation fur the Key Wav <br />for~the Dam at Pond 006. They had placed and compacted on <br />site clay material up to 20 feet below the ton of Lhe dam. <br />We conducted 3 nuclear density tests within the liev Wov <br />area of Lhe riam. <br />Seneca Mine had placed a 6 foot diameter culvert near <br />STA. 6+35 at the beginning of FIau1 Road A. <br />We conducted 2 nuclear density tests at approxiwately ii <br />feet above Ltie top of tl~e culvert. <br />R6MARX5: <br />All te::ts conducted today met or exceeded Lhe <br />specification compaction requirements. <br />Please refer to the attached Nuclear Density worksheet <br />for details on today's testing. <br />We completed the hazard safety training course in order <br />,,~to comply with the yearly requirement as specified in the <br />~'S Metter recently received from Peabody Coal Company: <br />...:{,~ i <br />.~;; . <br />~~~'~~ I •VSRDAL DISCUSSIONS: ~ _.. <br />' We discussed the proposed scope of wor)c wii:h Ray Armiiu, <br />the Engineering Manager. at the Gngineerine Lr•ailcr. h'e met <br />with Roy Kero, the Reclamation Supervisor, at the 1'oud sit (•. <br />He indicated where the testing was to t,e cuuducCed. Mr K:(ro <br />asked us to return to the site nn Monday murrain(:, October :., <br />1989. <br />• <br />RKPOIr•r xo. ; 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.