Laserfiche WebLink
• Mileage: 1 Rouurl <br />'trip <br />PROJECT: Seneca Pond 006, Ilaul Road A DATK: J/2II/f39 <br />LOCATION: Seneca W II Mine, Hoyden, CO T1Mf:: 2.5 hours <br />CLIENT: Peabody Coal Co. ENGR./TGC[1NICIAN: SJM <br />WORK PERrORMIsD: <br />Seneca Mine had completed the excavation fur the Key Wav <br />for~the Dam at Pond 006. They had placed and compacted on <br />site clay material up to 20 feet below the ton of Lhe dam. <br />We conducted 3 nuclear density tests within the liev Wov <br />area of Lhe riam. <br />Seneca Mine had placed a 6 foot diameter culvert near <br />STA. 6+35 at the beginning of FIau1 Road A. <br />We conducted 2 nuclear density tests at approxiwately ii <br />feet above Ltie top of tl~e culvert. <br />R6MARX5: <br />All te::ts conducted today met or exceeded Lhe <br />specification compaction requirements. <br />Please refer to the attached Nuclear Density worksheet <br />for details on today's testing. <br />We completed the hazard safety training course in order <br />,,~to comply with the yearly requirement as specified in the <br />~'S Metter recently received from Peabody Coal Company: <br />...:{,~ i <br />.~;; . <br />~~~'~~ I •VSRDAL DISCUSSIONS: ~ _.. <br />' We discussed the proposed scope of wor)c wii:h Ray Armiiu, <br />the Engineering Manager. at the Gngineerine Lr•ailcr. h'e met <br />with Roy Kero, the Reclamation Supervisor, at the 1'oud sit (•. <br />He indicated where the testing was to t,e cuuducCed. Mr K:(ro <br />asked us to return to the site nn Monday murrain(:, October :., <br />1989. <br />• <br />RKPOIr•r xo. ; 1 <br />