Laserfiche WebLink
<br /> <br />Mr. Dennis Kirtland -2- February 28, 1994 <br />6. The mining plan map shows previously mined areas. Please explain. Also, if <br />any of the previously mined area is outside of the proposed permit area you <br />should highlight it on the maps and mention it in the mining and reclamation <br />plans (if you do not want to be responsible for reclamation). ~-°~ <br />7. The mining plan map should show existing elevation contours. 1.1.5x- ~nA <br />~` J <br />8. The reclamation plan map should show the estimated final contours of the pit. <br />9. I need a narrative in paragraph 9 of the mining plan addressing a contingency <br />clean up plan for accidental spills of toxic, hazardous, or non-hazardous <br />materials (anti-freeze, oil drips, etc.) <br />10. You state you do not need a stormwater management plan permit in Exhibit F. <br />Please provide documentation. <br />Pursuant to Rule 1.5 file a copy of your adequacy response (along with the new maps) with <br />the County Clerk and Recorder and submit proof to the Division that it was filed. Anew <br />date for consideration of the application will be set by the Division upon your receipt of the <br />changes. <br />If you have any questions please give me a call. <br />Sincerely, <br />G ~~ <br />James Dillie <br />Environmental Protection Specialist <br />M: \OS S \amm\Kirilnd.j d <br />