My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE107868
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE107868
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:00:20 PM
Creation date
11/24/2007 3:56:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981207
IBM Index Class Name
Permit File
Doc Date
3/12/1991
Doc Name
BLUE PIT SUCCESSION APPROVAL PN M-81-207 REVISION SO-02
From
MLRD
To
WESTERN SLOPE AGGREGATES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiii iii <br />STATE OF COLORADO <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />7373 Sherman St., Room 275 <br />Denver, CO 80203 <br />303 866-3567 <br />Fa X: 303 832-8706 <br />March 12, 1991 <br />Mr. William M. Roberts <br />Western Slope Aggregates <br />P.O. Box 910 <br />Carbondale, Colorado 81ti23 <br />Re: Blue Pit, Succession Approval, <br />Permit No. M-81-207, Revision No. SO-02 <br />Dear h1r. Roberts: <br />pF p0~ <br />N~ ~oq9 <br />:. Io <br />r ~ <br />..~ ` <br />7 <br />~ X876 ~ <br />Roy Romer. <br />Governor <br />Fretl R. Banta. <br />Drvis~on Director <br />On March 11, 1991 the Colorado idined Land Reclamation Board approved the <br />succession of operators from Jean M and Dee Blue to 'destern Slope Aggregates <br />for this operation. Western Slope Aggregates is now the permitted operator <br />of the Blue Pit, and as such, is responsible for all provisions in Permit <br />No. M-81-207, as well as those specified in the idinerals Rules and <br />Regulations. Jean M and Dee Blue is relieved of all responsibilities <br />concerning this operation (See Mineral Rules and Regulations Number 1.7 ). <br />The Division would like to remind you, as the permitted operator, about a few <br />things we feel are important: <br />1. All of the application materials, as amended and supplemented, are an <br />integral part of your permit. They have been incorporated into the permit by <br />reference. We presume that you have a copy of all of these materials; <br />therefore, none have been enclosed with this mailing. We suggest that you <br />keep a copy of the permit and the permit application at the mining operation <br />as a reference for operating personnel, to help ensure compliance with the <br />terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Mineral Rules and Regulations and/or contacting us to determine <br />if a revision to the permit is necessary. Rule 1.8 pertains to Amendments, <br />Rule 1.9 to Technical Revisions, and Rule 1.10 to Conversions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.