Laserfiche WebLink
• <br /> <br /> E;{HIEIT C <br />' T4APS OF AFFECTED LAND, EOETTCHER Ls. QUARRY Page 2 <br />(Rev <br />4-28-78 ) <br /> . <br /> (b) Roads--A11 public roads are in excess of 200 feet from <br /> affected land. There are no wells or pipelines. <br />' (b) Buildings--All buildings shown are the property of Ideal. <br />' (b) Povaer Lines--An old REA power line crosses the A-sand <br /> quarry at the flood ditch crossing (Wrap sheets 3 rind !, ). <br />' When the E-band quarry reaches this point it will be <br /> necessary to move the north-south portion of this line <br />r to Ideal property east of the flood ditch. A11 other <br /> power lines within the designated affected lands are <br /> the property of Ideal. <br />' (c) The maps depict 5-foot interval contour lines as well <br /> as numerous spot elevations. <br /> (d) A total affected area of 895 acres is outlined in red <br /> acid green on the maps. The area outlined in green com- <br />' ~ <br /> prises 705 acres and is estimated as that area that wi <br />.l <br />' be affected by future quarry between 1980 to possioly <br /> 2030. This is intended to involve surety in increments <br /> as the quarry progresses. The red outlined area includes <br /> 131 acres of major disturbance and 59 acres of roads, <br /> il <br />d <br />l <br />f <br />i <br />t <br />t <br /> c. <br />er- <br />temporary stockp <br />p <br />use area, e <br />n <br />es aci <br />ant re <br />' preted ,is mode.rat,e disturbance. Areas disturbed prior <br /> to .July 1, 1976 that vrill not be redisturbed or continued <br />' in active use were not included except where the eventual <br /> reclamation of C-band quarry is expected to enable the <br /> <br /> reel:imaCion of the A-band quarry highwall as narrated in <br />E>:hibit E. <br />