My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE107790
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE107790
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:00:16 PM
Creation date
11/24/2007 3:50:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995009
IBM Index Class Name
Permit File
Doc Date
8/22/2002
Doc Name
Cost Summary Form
From
DMG
To
Fisher Sand and Gravel Co.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFlCATION <br />Agency or organization name :OMG <br />Task tl : 007 Slate: Colorado Pertnit/job 3: M-1995-009 <br />Date: 08@22002 CounN:Kit Carson AbbreviaHOn :none <br />User: JDI Site:Fasse Pit Filename:M009-007 <br />Permit or other job action ;Final Reclamation <br />Task tlescnption ; MOWdemob equipment <br />TRANSPORT RIG COST Shift basis : 1 per tlay <br />Cost data source : CRG Data <br />Truck Tractor description :Generic arvhighwaymrak tr8cror 6X4, diesel poruerM. 400 HP <br />Tmek lrwilwr dascrirnion ~Genedc /oltling gooseneck, drop deck epuipmant frailer (25T, SOL and 901) <br />Available rig capacities: 0-23 Tons 2E50 Tons <br />Gost ereaktlawn~ Ownership cosMOUr. $24.34 326.99 <br />Operating eosMOUr $28.09 $30.27 <br />Operator cosMOUr: 32L07 $2207 <br />Helper cgsvhout 80.00 523. ]B <br />Total UnR COSVhour 57990 3108.11 <br />NON-ROAOABLE EQUIPMENT <br />Machine Weight/unil Ownership Heul Rig Fleel Size Haul Trip <br />Oascription (Tons) CosUTr/unit CosUhr/unit (NO. units) CosMr/fleet 51+TOns <br />533.09 <br />334.34 <br />52].07 <br />$2318 <br />3118.28 <br /> <br />Return Trip DOT permd <br />CosMrRleet CostMleet <br />-Cat DBR-BU 47.47 342 d4 $108./1 1 $150.55 5108.11 $0.00 <br />-CAT 980G S1endaN lik 32.82 $33.32 $108.11 1 Std 1.43 $108.11 $0.00 <br />-CAT 14pH 16.23 SIB 25 379.90 / 598.15 51990 $0.00 <br />-Cat 623E <br />-seeding equiPmenf 38.92- <br />10.00 $48.53 <br />320.00 3108.11 <br />$78.90 1 <br />f $156.64 <br />599.80 5108.11 <br />879.90 30.00 <br />$0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SubtgW8 3646.68 3084.13 $0.00 <br />ROADABLE EOUIPMEM <br />Machine Total Fleet Size <br />Description osMOUr/and (NO. ands) <br />Haul Trip <br />Cost/hr/Fleat <br />Retum Trip <br />CosVhr/fleet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals 50.00 50.00 <br />QLIPMENT HAUL DISTAN CE nd TIM E <br /> Nearest maj or ciN or town within prolecf area region : BOdmfgn <br />Tran=_ponafon Cvcle T'me: Nan- Total one-way travel distance: 8.0 miles <br /> Roadabls Roadable Average travel speed : 45.0 mph <br /> Equioment Equipment <br />Haul lime (hours) = 0.18 O.1B Total namroadable mob/demob cost': 55,575.48 <br />Return lima (hours) = 0.18 O 1B • 1no routs trge w6h taN M19 <br />Loading time (hours)= 2.00 NA Total roatlabla mob/demob cost": $0.00 <br />Unloading time (hours)= 2.00 NA one mwMlHp, np lain dg <br />Subtotals= 4.36 0.3fi <br />JOB TIME AND COST Tolallob time: 8.71 hours <br /> Total lob crosl : $5,575 <br />
The URL can be used to link to this page
Your browser does not support the video tag.