Laserfiche WebLink
5.2 PRODUCTION . <br />SCC has estimated the following production and recovery for the highwall mining operation: <br />Year Tons <br />2002 900,000 <br />2003 500,000 <br />2004 500,000 <br />2005 200,000 <br />Total 2,100,000 <br /> <br />u <br />12-2-4 TR-21 <br />