Laserfiche WebLink
<br />• <br />-6- <br />INFORMATION CATEGORY <br />2.05.3(4) Ponds, Impoundments and P~ <br />Diversions ~ <br />2.05.3(5) Topsoil (removal and <br />storage) Pz <br />2.05.3(6) Overburden <br /> Pe <br />2.05.3(7) Coal Handling Structures <br /> Pt <br />2.05.3(8) Coal Processing Waste and <br />Non-Coal Processing Waste p~ <br />2.05.3(9) Underground Development <br />Waste p~ <br />2.05.3(10) Return of Coal Processing <br />Waste to Abandoned p~ <br />Workings <br />2.05.4 Reclamation Plan Page ~.u~.4-1 xeclamation riz <br />2.05.4(2)(a) Timetables <br /> Page 2.05.4-11 <br />2.05.4(2)(b) Reclamation Cost Estimates) Exhibit 25 <br /> Reclamation Bon <br />2.05.4(2)(c) Backfilling and Grading *Post-mining <br /> Page 2.05.4-2 topography -See <br /> 2.05.4(2)(c) <br />2.05.4(2)(d) Topsoil (Redistribution) <br /> Page 2.05.4-5 <br />2.05.4(2)(e) Revegetation Page 2.05.4-24 RMapa29~ion Pla <br /> <br />2.05.4(2)(f) Disposal of Debris, Acid- page 2.05.4-34 <br />Forming and Toxic-Forming <br />Materials <br />~n snap c`-~ <br />#6 below <br />n <br /> <br />