Laserfiche WebLink
C~ <br />7 Drill Sites <br />k'VWOEFIriQPN CURL COMPANY <br />SOUTH LEASES EXPLORATION PLAN <br />1985 <br />TABLE 2 <br />RECLAMATION COSTS <br />Length: 60 ft. Width: 70 ft Area Acres: 0.67 <br />ITrM QUANTITY UNIT UNIT COST TOTAL COST <br /> <br />Rippinc 6 Regrading <br />Cat D-7 Dozer with <br />Ripper and Operator 3.5 Hrs 5150.00 525 <br />Reclamation <br />1 - Cat D-5 Dozer with <br />Tye Range Dri11 and <br />Operator 3.5 Hrs 70.00 525 <br />2 - Fertilizer 0.67 Acre9 372.00 250 <br />3 - Seed 0.67 Acres 84.00 56 <br />1 •IKulchinq - Finn Straw- <br />blower (Mechanical <br />criav covered in <br />item 1 above) 0.67 Acres 100.00 67 <br /> 1,423 <br />MISCELLANEOUS COST <br />Estimated Contractor <br />Overhead ~ Profit <br />Overhead @ 158 <br />Profit @ 108 <br />• <br />213 <br />142 <br />1,778 <br />Y' ~ <br />