Laserfiche WebLink
POWDERHORN COAL COMPANY <br />SOUTH LEASES EXPLORATION PLAN <br />• 1985 <br />TABLE 2 <br />RECLAMATION COSTS <br />Road to PCC-03 Length: 5,280 ft. Width: 15 ft Area Acres: 1.82 <br />ITEM <br />Ripping S Regarding <br />Cat D-7 Dozer with <br />Ripper and Operator <br />Reclamation <br />1 - Cat D-5 Dozer with <br />Tye Range Drill and <br />Operator <br />Fertilizer <br />3 - Seed <br />4 - Mulching - Finn Straw- <br />blower (Mechanical <br />crimp covered in <br />item 1 above) <br />QUANTITY UNIT <br />8 Hrs <br />$1,200.00 <br />8 Hrs 70.00 560.00 <br />1.82 Acres 372.00 676.00 <br />1.82 Acres 84.00 153.00 <br />1.82 Acres 100.00 182.00 <br /> $1,571.00 <br />UNIT COST <br />$150.00 <br />TOTAL COST <br />Mobilization/Demobilization <br />Cat D-7 <br />Cat D-5 <br />Reclamation Equipment <br />1 - Set <br />Miscellaneous Cost <br />Estimated Contractor <br />~rhead & Profit <br />Overhead @ 158 <br />Profit ? 108 <br />2 Hrs 130.00 260.00 <br />2 Hrs 130.00 260.00 <br />2 Hrs 60.00 ~ 120.00 <br />$ 640.00 <br />S 416.00 <br />S 277.00 <br />$4,104.00 <br />