Laserfiche WebLink
<br /> <br />E%BIBIT L <br />RiCI.BMATION CO8T6 <br />Only a portion of the site will be disturbed at one time due to <br />mining phases and concurrent reclamation. <br />Reclamation costs are based on the greatest area of land <br />disturbance expected at one time including haul roads to the <br />stockpile area, the plant site, and mine site. <br />Major Disturbance <br />No additional major disturbance is anticipated. <br />Moderate Disturbance <br /> <br />~Q, <br />IT6M Q <br />UANTITY <br />UNITS UNZT <br />PRICE TOTAL <br />PRICE <br />1. Final Grading of <br /> Plant Site (2 AC) 3,227 CY $ 1.00 $ 3,227 <br />2. Grading and Shapping <br /> of Mine Area (10 AC Max ) 16,133 CY $ 1.00 $16,131 <br />3. Regrade Haul Road To <br /> Blend With Existing <br /> Landscape (2.5 AC Max) 4,033 CY $ 1.00 S 4"033 <br /> TOTAL $23,393 <br />Minor Disturbance <br />None <br />8u~ry of Reclamation Costa <br />Total Disturbance $23,393.00 <br />Administration Fee (15.8$) S 3.696.00 <br />TOTAL RECLAMATION COSTS $27,089.00 <br />Reclamation Bond $27,089.00 <br />Bonded Cost per Acre at 19.5 acres $ 1,869.00 <br />L-1 <br />