Laserfiche WebLink
'~ Wm. Beavers • <br />p-2 • September 15,1983 <br />We project the revised reclamation costs as follows: <br />Material handling (unchanged) $ 96,800 <br />Grass seed ($1440) fertilizer ($333) 1,773 <br />Clean straw 2,22D <br />Compaction, seeding, etc. 1,480 <br />Scarification 660 <br />Total reclamation costs-~ $102,939 <br />-'~ Note: The total estimate covers a full 37 acres, when in fact <br />there may be as much as 5 to 6 acres in several locations <br />that will not be disturbed. <br />Sincerely, <br />Don Lee, Vice-President <br />cc: Don Rapp, Consultant <br />