Laserfiche WebLink
<br />r <br />Appendix B <br />1998 Scheduled Reclamation Construction Activities <br />• Bitter Creek <br />DMG Permit M/77/29~ <br />Stormwater Permit COR-04010 <br />Umetco plans to inspect and close physical hazards on prelaw patented mining claims <br />in this azea during 1998. <br />• CSR-15A DMG Permi <br />Stormwater m OR-040106 <br />Umetco is scheduled to apply for release of the DMG permit during 1998. <br />• Deremo-Snyder <br />DMG Permit M/77/288 <br />Stormwater Permit COR-040112 <br />Continuation of the reclamation of the mine site is expected to occur during the <br />summer months. Scheduled activities aze remediation of contaminated soils, <br />topsoiling, and seeding. <br />• Eagle Basin <br />DMG Permit M/79/290 <br />Stormwater Permit COR-040136 <br />Mine openings may be closed in this area. <br />• Eula Belle Mine <br />DMG Permit M/77/291 <br />Stormwater Permit COR-040103 <br />Umetco is scheduled to close pre law mine openings near the confluence of Mesa <br />Creek and the Dolores river on patented mining claims. <br />• Full Moon <br />DMG Permit M/77/119HR <br />Stormwater Permit COR-040111 <br />Umetco is scheduled to apply for release of the DMG permit during 1998. <br />• King Solomon <br />DMG Permit M/77/296 <br />Stormwater Permit COR-040103 <br />Mine openings may be closed in this area. <br />