Laserfiche WebLink
a <br />rL <br />N <br />N <br />m <br />rn <br />n <br />o. <br />cr <br />�r <br />U <br />lc. <br />Lo <br />s <br />z <br />tL- <br />a <br />n <br />i <br />D�T <br />m <br />00 <br />i <br />1� <br />F�4 <br />COLORADO RIVER UNITED STATES OF AMERICA <br />BUREAU OF RECLAMATION <br />ATTN. UCH27 <br />Pn BOX 11568 <br />! SALT LAKE CITY, UT 84147 <br />ZE'XIS MESA SURFACE <br />i <br />LOT 4 \, <br />/ G.L.O. LOT 6 <br />ORIGINAL PIT � <br />PERMIT BOUNDARY <br />O <br />- PA57UR£^ AREA 3 <br />—CF TT DLRCnNG \\\ <br />2• AREA 2 I ' <br />I , <br />N' MINING I I <br />Z DIRECTION <br />SAND <br />I 1 <br />OJ EXPANDED PIT \ I 1 <br />1 A• �p PERMIT BOUNDARY END PAVEMENT <br />PROPERTY LINE TOPSOIL PROCESSING ��� <br />� -0. GRIFFITH \ <br />WA309 R GRIFFI rH \ ^ CROPLANO^- <br />, <br />GRAND JUN CO 81503 -96 73 <br />CTION <br />LOT 5 <br />`G. L.O. LOT 7 OVERBURDEN EXISTING ROADBASE STOCKPILE <br />EXPANDED PIT PERMIT}— A 332 % RD.IP <br />EXCAVATION LIMIT �\ � � _ <br />t I ' <br />9 I 1 I <br />4 I I I r <br />1 <br />I I 1 y1 <br />I I <br />i <br />L;� .l I <br />295' BUFFER <br />I I t <br />LOT 6 I <br />I ) <br />1 <br />- CROPLAND- 1 <br />I I <br />I <br />I I <br />f AREA 2 <br />Q\�\ MINING <br />PROPERTY LINE \ AREA f AREA 2 _ DIRECTION 1 <br />POND \ AREA 1 MINING —� MINING - <br />MINING DIRECTION ' DIRECTION DIRECTION <br />_ � I <br />�� I <br />r <br />tiw1 \wl rAlvlW ` 1v.J S.iJ a a a e a a a e �. <br />660' EXPANDED PIT PERMIT 30' BUFFER <br />30' BUFFER 5' HIGH BERM (SEEDED) EXCAVATION LIMIT JJ- EXISTING TREES <br />\ 3:1 SLOPE I PROPERTY LINE I <br />A <br />\ L . GC RD EXISTING PAVED 20' HAUL ROAD I <br />WANDA R. GRIFFITH I I C <br />\ 3094. C) <br />GRAND JUNCTION. CO 8150:I -9873 <br />- PAS7URE- <br />\\ - CRCwLAIll I I I I I <br />\ I I I -CROPLAND- I -CROPLAND- <br />JACK M SANCHEZ DONNA R MELCOSA I'A M .,ONLY <br />SHERRILL S. SANCHEZ C/O BESSIE M. LIGHTHIZER 1126 C III; <br />PO BOX 40661 651 FOREST SANND JUNC1I0N. ;.c B• <br />GRAND JUNCTION, CO 81504 -0661 MESA, AZ 85203 -6650 <br />\ I <br />'I <br />\ I I I - PAS76RE I <br />\ I I PATRICK J. STEINKIRCHNER <br />1 I I TERESA M STEINKIRCHNLR <br />3 <br />I 0 <br />II I I I I GRAND JUNCTION. C R TION, CO 81503 I <br />as <br />8EC.21. T. 1 3., R. 1 E. 8EC.22. T. 1 8.. R. 1 E. :( ...... . <br />8EC.28. T. 1 8.. R. 1 E. 0 PAVED 0 C ROAD 0 <br />SEC.27, T. 1 8., R. 1 E. <br />< RANDY PATTERSON <br />O 3133 C RD <br />0' GRAND JUNCTION. CO 81503 -9682 <br />n <br />I <br />DRAWN BY <br />, <br />BKR <br />REVIEWED <br />3198 C RD <br />DATE: <br />DESIGNED BY <br />_ <br />BKR <br />0 <br />1- 0 <br />REVIEWED <br />CHECKED BY: <br />0 <br />DATE <br />DEC <br />N <br />/ AMERICAN CONSULTING <br />FOR . _ �II, ENGINEERS COUNCIL o/ COLORADO' <br />BANNER <br />BANNER ASSOCIATES, INC. • CONSULTING ENGINEERS 8 SURVEYORS <br />FOR BANNER ASSOCIATES, INC 2777 CROSSROADS BOULEVARD • GRAND JUNCTION, CO 81506 • 19701 243 -2242 <br />- CROIRtANl , <br />, <br />DARRIUS WILLIAM DLWtIES I <br />I <br />3198 C RD <br />GRAND JUNCTION, CO 81503- 96019 <br />0 <br />1- 0 <br />0 <br />DARRIUS WILLIAM DEW TS N <br />N <br />1198 C RD K <br />K <br />rc� <br />TI TON E. PATTER50N <br />LEONA R PATTERSON <br />3143 C RD <br />GRAND JUNCTION, CO 81503 -9682 <br />u m W <br />t- J z <br />J <br />0 30' BUFFER r <br />RECLAIMED 3 1 SLOPE � <br />5 "TOPSOIL & OVERBURDEN(MIN.) a <br />AREA 3 BERM z > L`T <br />SEEDED KITH DRriAND GRASSES a a ao <br />(MINED LAST) MINED AT 1'1 FACE u K <br />w EXISTING MESA SURFACE <br />---- --- --- <br />3' STORMWATER RETENTION TOPSpL # OVERBURDEN <br />BERM (2:1 SLOPE MAX.) GRADE TO DRAIN (1% TYP.1 - - - -' -- <br />MINED SURFACE _ _- _� °'�• T_ <br />MAN; OS SHALE <br />PIT FLOOR <br />`2' GRAVEL(MIN.) <br />�Q' 2' OVERBURDEN AND TOPSOIL TOE OF FILL <br />COLORADO RIVER 2= (TILLED AND PREPARED FOR SEEDING) <br />TYPICAL MINED SECTION <br />A —A SECTION <br />NOT TO SCALE <br />30' BUFFER ZONE <br />660' EARTH BERM SECTION <br />N <br />FEET 200 0 200 FEET <br />11 I 1 � 1 I I <br />GRAPHIC SCALE <br />SCALE: 1 INCH =200 FEET <br />GENERAL NOT <br />THE EXISTING MINED OUT AREA WAS MINED BY PARKERSON CONSTRUCTION. <br />DATUM IS USGS CLIFTON QUADRANGLE, 7.5 MINUTE SERIES, <br />PHOTOREVISED 1973 <br />PIT FINISH FLOOR GRADE IS APPROXIMATE. FINAL GRADE WILL BE <br />DETERMINED BY THE EXTENT OF GRAVEL DEPOSITS WHICH CAN <br />BE EXTRACTED. <br />OVERBURDEN AND TOPSOIL FROM STOCKPILE WILL BE PLACED FOR PIT <br />RECEIVED FLOOR GRADING. FINISH GRADING WILL SLOPE FROM TOE OF SLOPE <br />ALONG PIT UMIT BUFFER ZONE TO COLORADO RIVER BANK. RECLAIMED <br />FLOOR WILL CONSIST OF 2' OF TOPSOIL AND OVERBURDEN PLACED ON <br />2'(MIN.) OF GRAVEL LEFT ON PIT FLOOR. ALL RECLAIMED SLOPES <br />APR U 6 1996 <br />TO BE 3:1 MAXIMUM. <br />Division of Minerals 8 Geology <br />EXPANDED PIT <br />AREA SUMMARY AND APPROXIMATE QUANTITIES <br />AREA ACREAGE OVERBURDEN GRAVEL <br />(CY) (CY) <br />1 10.31 60930 277935 <br />2 38.80 670555 1073210 <br />3 3.32 47980 89195 <br />HAUL ROAD 0.60 <br />TOTALS 53.03 779465 1440340 aoceved <br />P.nnll Nultyber 1 ��� � Class Pe I eclioI, Z' n \(1 L <br />Class: ❑ Revision <br />TypelSeq <br />Class'. O Report O Hydro ❑Genaeral - - - - - - <br />Dec, Type. <br />......__._- _...._.only --0 - loon._. ---- __- -- - <br />OAppllcation (Coal only) ❑ Bnnntl ❑ Enforcement � Inspection <br />REVISION DATE DESCRIPTION BY CH'D PARKERSON CONSTRUCTION INC. <br />1 2/10/98 ADDED BERM SGS DEC <br />MINING PLAN <br />31 ROAD PIT <br />EXHIBIT C <br />1O <br />.,,n F•�b Ok", o\o91 <br />�faT �\OBI2�5 a <br />pn o1 <br />Off° <br />GRAND JUNCTION, COLORADO SCALE: JOB NO DATE, <br />I' 200' 8358-03 3/20/98 <br />SHEET N0. <br />I OF I <br />IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII III <br />30' BUFFER ZONE <br />660' EARTH BERM SECTION <br />N <br />FEET 200 0 200 FEET <br />11 I 1 � 1 I I <br />GRAPHIC SCALE <br />SCALE: 1 INCH =200 FEET <br />GENERAL NOT <br />THE EXISTING MINED OUT AREA WAS MINED BY PARKERSON CONSTRUCTION. <br />DATUM IS USGS CLIFTON QUADRANGLE, 7.5 MINUTE SERIES, <br />PHOTOREVISED 1973 <br />PIT FINISH FLOOR GRADE IS APPROXIMATE. FINAL GRADE WILL BE <br />DETERMINED BY THE EXTENT OF GRAVEL DEPOSITS WHICH CAN <br />BE EXTRACTED. <br />OVERBURDEN AND TOPSOIL FROM STOCKPILE WILL BE PLACED FOR PIT <br />RECEIVED FLOOR GRADING. FINISH GRADING WILL SLOPE FROM TOE OF SLOPE <br />ALONG PIT UMIT BUFFER ZONE TO COLORADO RIVER BANK. RECLAIMED <br />FLOOR WILL CONSIST OF 2' OF TOPSOIL AND OVERBURDEN PLACED ON <br />2'(MIN.) OF GRAVEL LEFT ON PIT FLOOR. ALL RECLAIMED SLOPES <br />APR U 6 1996 <br />TO BE 3:1 MAXIMUM. <br />Division of Minerals 8 Geology <br />EXPANDED PIT <br />AREA SUMMARY AND APPROXIMATE QUANTITIES <br />AREA ACREAGE OVERBURDEN GRAVEL <br />(CY) (CY) <br />1 10.31 60930 277935 <br />2 38.80 670555 1073210 <br />3 3.32 47980 89195 <br />HAUL ROAD 0.60 <br />TOTALS 53.03 779465 1440340 aoceved <br />P.nnll Nultyber 1 ��� � Class Pe I eclioI, Z' n \(1 L <br />Class: ❑ Revision <br />TypelSeq <br />Class'. O Report O Hydro ❑Genaeral - - - - - - <br />Dec, Type. <br />......__._- _...._.only --0 - loon._. ---- __- -- - <br />OAppllcation (Coal only) ❑ Bnnntl ❑ Enforcement � Inspection <br />REVISION DATE DESCRIPTION BY CH'D PARKERSON CONSTRUCTION INC. <br />1 2/10/98 ADDED BERM SGS DEC <br />MINING PLAN <br />31 ROAD PIT <br />EXHIBIT C <br />1O <br />.,,n F•�b Ok", o\o91 <br />�faT �\OBI2�5 a <br />pn o1 <br />Off° <br />GRAND JUNCTION, COLORADO SCALE: JOB NO DATE, <br />I' 200' 8358-03 3/20/98 <br />SHEET N0. <br />I OF I <br />IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII III <br />TOTALS 53.03 779465 1440340 aoceved <br />P.nnll Nultyber 1 ��� � Class Pe I eclioI, Z' n \(1 L <br />Class: ❑ Revision <br />TypelSeq <br />Class'. O Report O Hydro ❑Genaeral - - - - - - <br />Dec, Type. <br />......__._- _...._.only --0 - loon._. ---- __- -- - <br />OAppllcation (Coal only) ❑ Bnnntl ❑ Enforcement � Inspection <br />REVISION DATE DESCRIPTION BY CH'D PARKERSON CONSTRUCTION INC. <br />1 2/10/98 ADDED BERM SGS DEC <br />MINING PLAN <br />31 ROAD PIT <br />EXHIBIT C <br />1O <br />.,,n F•�b Ok", o\o91 <br />�faT �\OBI2�5 a <br />pn o1 <br />Off° <br />GRAND JUNCTION, COLORADO SCALE: JOB NO DATE, <br />I' 200' 8358-03 3/20/98 <br />SHEET N0. <br />I OF I <br />IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII III <br />