Laserfiche WebLink
PART [ <br />Page 20 <br />Permit No. CO-0000:!21 <br />D. :iPECIAL REQUIItEMENTS <br />2. Stormwater Requirements icontinued) <br />• <br />iii) Preventive Maintenance - A preventive maintenance program shall be included. The prograza shall <br />involve maintenance of stormwater management devices (e.g., maintenance of dikes separatinf; mine <br />drainage from stotmwater, cleaning oi]/water separators and catch basins, etc.), as well as maintenance of <br />equipment and systems to prevent conditions that could cause breakdotvDS or failures resulting in discharges <br />of pollutants to surface waters. <br />iv) Good Housekeeping -The SWMP shall identify good housekeeping procedures that will be followed by the <br />mining operation. Good housekeeping requires the maintenance of a clean, orderly facility. -.ibis pan of <br />the SWMP shall address cleaning and maintenance schedules, trash disposal and collection practices, <br />grounds main[eriance, etc. <br />v) Spill Prevention and Response Procedures -Areas where potential spills can occur, and their <br />accompanying drainage points, shall be identified clearly fn the SWMP. Where appropriate, specif}•ing <br />material handling procedures and storage requirements in the plan shall be considered. Procedures for <br />cleaning up spills shall be identified in the plan and made available to the appropriate personnel. The <br />necessary equipment [o implement aclean-up shall be available [o personnel. <br />vi) Employee Education -The SWMP shall describe employee education programs to inform personnel at all <br />levels of respon:;ibiliry (who are involved in mining activities that may impact stormwater runoff) of the <br />components and goals of the SWMP. Education shall address topics such as spill response, good <br />housekeeping and material management practices. The SWMP shall identify periodic dates fo:- such <br />instruction. Contractor or temporary petsomel shall be informed of mine operations and control featur~ <br />order to prevent stormwater pollution from occurring. <br />vii) Identification of Discharges other than Stormwater -The stormwater conveyance system on dte site shall <br />be evaluated for the presence of discharges other than stotmwater. The SWMP shall include a description <br />of the results of any evaluation for the presence of discharges other than s[ormwater, the method used, the <br />date of any evaluations and the on-site drainage points that were directly observed during the [:valuation. <br />6) Comorehensive Insoection. The SWMP shall identify qualified persowel who shall inspect design,r[ed <br />equipment and mine areas a[ appropriate intervals specified in the plan (at least twice a year, in the spring and <br />falh. <br />7) Recordkeeoine and Internal Renortine Procedures. The SWMP shall identify procedures for recortlkeeping and <br />internal reporting. <br />S) Consistency with Other Plans and Availability. The SWMP may reflect requirements for Spil] Prevention <br />Control and Countermeasure (SPCC) plans tinder section 311 of the CWA, or Best Management Practices <br />(BMPs) Programs otherwise required by a CDPS permit, and may incorporate any part of such plans into the <br />SWMP by reference. The SWMP may rely upon information developed for other similar pollution control <br />programs, including the Mined Land Reclamation Plan. Appropriate portions of these other plans tray be <br />incorporated in the SWMP by reference, as long as a complete SWMP can be reproduced and submitted to the <br />requesting agency within the time frame specified in the request. Those portions of the referenced documents <br />must be included in the submittal. The complete SWMP must also be readily available to an on-site inspector. <br />9) Allowable Non-Stonnwater Discharees. The plan shall identify all sources of irrigation return flow and namral <br />uncontaminated spring water that are combined with stormwater discharges associated with industrial activirv. <br />The plan shall identify and ensure the implementation of appropriate measures to prevent pollution of the <br />non-stormwater component(s) of the discharge. <br />Irrigation return Bow and natural spring water which miz with mine drainage or process water bearme mine <br />drainage or process water. <br />tNDaP 0/9/93 <br />