Laserfiche WebLink
• <br />A. COVERAGE UNDER TffiS PERMIT (cont.) <br />As of October 1, 1992, this address will change to: <br />Colorado Department of Health <br />Water Quality Control Division <br />WQCD-PE-B2 <br />4300 Cherry CreeY Drive South <br />Deaver, Colorado 80222-1530 <br />Attention: Permits and Enforcement Section <br />PART I <br />Page 4 <br />Permit No. COR-04001)0 <br />b. Summary of Application: The application requires, at a minimum, the following: <br />-.~J <br />1) Name, and addrrae of the applicant; <br />2) Site address and lorstion; <br />3) Facility wntact person sad telephone number; <br />4) Standard Industrial Classification (SIC) code(s); <br />S) The sin of the mining operation in acrca; <br />6) Scotus u active or inactive; <br />7) list of any other mvironmeatal permits currently Geld by the facility; <br />S) Activities which talcs place at tho site; <br />9) Receiving waters; and <br />10) For new aetive mining operations (begimriag operations after 10/1/92) or existing facilities applying after <br />7/1/93, certification as to the preparation of a SWMP. For inactive mining operations applying after July <br />1, 1994, certifintion as to the preparation sad implementation of a SWMP. <br />c. Certification of SWMP Completion and Implmtentation <br />For active mining operations, existing on October 1, 1992, the permittce shall have implemented and be in <br />compliance with their SWMP, as soon as possible but no later than the eaniversary date of their Mined Land <br />Reclamation permit that falls between July I, 1993 and June 30, 1994. Certification to this effect must be <br />received by the Division on or before that date. <br />For new active faulitie5 (begiming operations after October 1, 1992), and for all other active facilities applying <br />after ]uly 1, 1993, the SWMP shall be prepared prior to applying for coverage tinder the general permit. <br />For inactive mining operatioas, applying before July 1, 1994, as soon as possible but no later than July 1, 1994, <br />the pemtittce shall have implemented and be in compliance with their SWMP. Certification to this effect must <br />6e received by the Division en or before that date. For those applying after July 1, 1994, the SWMP shall be <br />preparod prior W applying for coverage under the general permit. <br />4. Permit Certifimtion ProcedtQes <br />If this general permit is appropriate for the applicant's operation, then a certification will be developed and the applicant <br />will be authorised to discharge atarmwater under this general permit. <br />• <br />a. Request for Additional Information: The Division shall have up to thirty days after receipt of the above <br />information to request additioml data and/or dmy the authorisation for any particular discharge. Upou receipt <br />of additional information, the Division shall have an additional Fdteen days to issue or deny authorisation for the <br />particular discharge. Temporary coverage order this general permit will be allowed until the individual permit <br />goes into eflcet. <br />b. Atrtatnatic Coverage: If the appGcaat does not receive a request for additional information or a notification of <br />denial form the Division dated within thirty days of receipt of the application by the Division, authorisation to <br />discharge is accordance with the conditions of this permit shall be dcemed granted. <br />