Laserfiche WebLink
<br />f <br />,... . ENVIROCON, INC. <br />• woo aoun~ ... wr <br /> wrtE ro <br /> w~ruv, ur~w wim <br /> TfLEp1CME (~1 m6i7M <br /> /~%: (1011 ~i!!t <br />ENC~IROCON, INC. <br />April 15, 1993 <br />Ms. Kathleen Welt <br />Mountain Coal Company <br />West Elk Mine <br />P.O. Boz 591 <br />Somerset, CO 81434 <br />RE: PROFESSIONAL CERTIFICATION OF MAIN HAUL ROAD <br />MOUNTAIN COAL COMPANY, WEST ELK MINE <br />SOMERSET. COLORADO <br />Dear Kathy. <br />This letter serves as the professional certification for the new haul road <br />segment constructed in the fall of 1991 for Mountain Coal Company. Charles C. <br />Reha, served as the professional engineer during the design and construction of this <br />project. Mr. Rehn has seventeen years of ezperience is geotechnical engineering and <br />is registered in the state of Colorado. He has consulted for Mountain Coal Company <br />on various projects since 1984. <br />The rules and regulations for coal s+~n~*+g regarding certification is as follows: <br />"4.03.1(1) (d) The design and construction or reconstruction ofhaul <br />roads not within the disturbed area in accordance with 4.05.2(1) shall <br />be certified by a qualified registered professional engineer, if required <br />by the Division for good cause shown." <br />The project being certified is the new haul road segment .located in the <br />northeast corner of the West Elk Mine site to serve as the main access for mine <br />personnel. The closure of the original haul road was caused by the construction of <br />the stack tubes and new crusher building. The new segment is approffimately 2500 <br />feet long and is bounded by the lower refuse pile on the west and north sides and by <br />A G~/1 es Company ~~ <br />