Laserfiche WebLink
GHOST RIVER GRAVEL PIT <br />RECLAMATION COST <br />1 REPLACE OVERBURDE<• <br />2 VERT. HIGHWALL REDUCTION <br />2 GRASS SEED MIX 50% FAILURE RATE <br />3 FERTILIZER-available N & P <br />4 TOPSOILING-SCRAPERB DOZER 26%SWELL <br />5 SCRIFIYING HARD PAN AREAS ONLY 2AC <br />6 SEEDBED PREPARATION and PLANTING <br />7 MULCHING HAY or STRAW <br />8 WEED CONTROL <br />9 MOBILIZATION 8 DEMOBILIZATION <br />QTY. UNIT COST UNIT <br />3500 $0.58 LCY <br />a so.az LCY <br />ss s1s3.zs ACRE <br />s.s ss.eo ACRE <br />s600 50.58 LCY <br />s6eo so.aa SOYD <br />ss s13o.oo ACRE <br />s.s sz2o.oo ACRE <br />s.s s3s.oo ACRE <br />z s7so.oo EA <br />TOTAL DIRECT COST <br />INDIRECT COST OVERHEAD and PROFIT <br />PUBLIC LIABILITY INSURANCE <br />CONTRACTOR PERFORMANCE BOND COST <br />CONTRACTOR PROFIT <br />DMG PROJECT ADMINISTRATION EXPENSE <br />TOTAL PERFORMANCE BOND AMOUNT <br />GHOST RIVER GRAVEL PIT <br />1.55% <br />1.55% <br />10.00% <br />5.00% <br />COST/ACRE <br />cosy <br />$2,030.00 <br />so.oo <br />51,616.18 <br />sszaz <br />$3,248.00 <br />$387.20 <br />s1,za7.oa <br />$2,178.00 <br />$346.50 <br />sl,soo.oo <br />$12,650.30 <br />$196.08 <br />$196.08 <br />$1,265.03 <br />$632.51 <br />$14,940.00 <br />$1,509.09 <br />