Laserfiche WebLink
<br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman S[., Room 215 <br />Denver, Colorado 80203 <br />Phone: (3031 866-3567 <br />FAX:(303)832-8106 <br />CONSTRUCTION MATERIAL <br />LIMITED IMPACT (110) OPERATION <br />RECLAMATION PERMIT APPLICATION PACKAGE <br />APPLICABILITY: <br />~~ <br />DIVISION OI <br />MINERAL' <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFET7 <br />Bill Owens <br />Governor <br />Greg E. watcher <br />Executive Director <br />Michael B. Long <br />Division Director <br />This application package is for a construction material extraction operation affecting LESS than 10 acres. If you plan to conduct a constmction <br />material extraction operation which meets these criteria, please follow the instructions provided in [his package, in the Rules and Regulations, <br />and in the Colorado Land Reclamation Act for the Extraction of Construction Materials, as required. <br />RECOMMENDATIONS PRIOR TO FII,ING: <br />The Construction Material Rules and Regulations (the Colorado Land Reclamation Act for the Extraction of Construction Materials, <br />Section 34-32.5-101, eta, C.RS., and 2 CCR 407-i), and the Colorado Mined Land Reclamation Board (the "Board") regulate the <br />permitting, operational and reclamation regnuements for all construction material extraction operations in Colorado. It is your obligation to <br />comply with the Act and Regulations. You are encotvaged to obtain and review a copy of the Roles, avaihrble for 58.00 from the Division of <br />Minerals and Geology (the "Office"). In order to submit your application properly, it is recommended that you review the Act and: <br />Rule 1.1 Definitions; <br />Rule 1.4 Application Review and Consideration Process; <br />Rule 1.6 Public Notice Procedures; <br />Rule 3.1 Rechtmalion Performance Standards; <br />Rule 3.3.1 Operating without aPermit -Penalty; <br />Rule 4 Performance Warranties and Financial Warranties; <br />Rule 6 Permit Apphcation Exhibit Requirements; <br />Rule 6.2 General Requirements of Exhibits; <br />Rule 6.3 Specific Permit Application Exhibit Requirements; <br />Rule 6.5 Geotechnical Stability Exhibit (as required). <br />It is recommended that you contact the agencies listed in the application section titled "Compliance With Other Laws" prior to submitting the <br />application to the Office . <br />