Laserfiche WebLink
~IIII~II~II~II~~II~ -)~ Zb61 /OU <br />sss <br />2273 River Road, P.O. Box 3609 21830 Hwy. 550 South, P.O. Box 1909 1300 CouNy Road 44711, P.O. Boa 92B <br />Caerd Junction, CO 81502 MaMraae, CO 81902 Nonarood, e0 81423 <br />(970)2434900 (970)249-1815 (970)3274586 <br />FAX: (970) 2435945 FAX: (970) 240-8497 FAX: (970) 3274113 <br />December 21, 2001 <br />RECEOVED <br />Colorado Mined Land Reclamation Board <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Dear Reclamation Board: <br />DEC 2 4 2001 <br />Division of Minerals end Geology <br />United Companies requests an extension of time be granted for the decision date on our <br />application for a Reclamation Permit for BLM Pit #1 (M-2001-100). One of the <br />Adequacy Issues mentioned by Environmental Protection Specialist Russ Means in the <br />Preliminary Adequacy Review of October 23, 2001 was the need for a Technical <br />Revision to the approved plan for the adjoining Hall Pit (M-1983-142). <br />A Technical Revision has been prepared for the Hall Pit requesting changes of use to <br />allow the Hall Pit area to be used as a support area for the BLM Pit #1 operation. The text <br />and map has been prepared for this Technical Revision. <br />Christmas holiday vacation schedules have interfered with United Companies' standard <br />procedure to print checks. The $188.00 check for the Technical Revision fee will be <br />available next week, December 27, 2001, which doesn't leave time to consider the <br />Technical Revision and permit application. <br />United Companies requests that the decision date for the BLM Pi[ #1 pernlit be changed <br />from January 2, 2002 to January 11, 2002. This should allow us plenty of time to get the <br />complete Technical Revision to tl)e CDMG for consideration. <br />Thank you. <br />Sincere) , <br />~~~ ~a~~ <br />Richard Johnson <br />Resource Manager <br />