My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1985-04-22_PERMIT FILE - M1974052
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1974052
>
1985-04-22_PERMIT FILE - M1974052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 6:39:53 PM
Creation date
11/24/2007 2:56:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974052
IBM Index Class Name
Permit File
Doc Date
4/22/1985
Doc Name
REGULAR 112 PERMIT APPLICATION FORM AMENDMENT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> WATEF2 I NP'OF?MAT I ON <br /> ' Each mining phase will be dewatered prior to excavation <br /> commencement. <br /> r The St. Vrain 100-year floodplain covers 90% of the permit <br /> area as shown on the Pre-Mining Map. The floodplain limits were <br /> obtained from Mr. William Stanton of the Colorado Water <br /> r Conservation Board as delineated by K.ucera and Associates. The <br /> site will be adequately graded to insure proper drainage from the <br /> site. <br /> rThree culverts will be installed between the ponds to allow <br /> proper drainage and ground water flow of the site. See <br /> r Reclamation Flan Map for locations. <br /> Water requirements for the proposed operation include 2, (')()0 <br /> gallons per day for haul roads dust suppression. Based on opera- <br /> ting 200 days per year, the requirement will be approximately 1 . 2 <br /> acre-feet per year. <br /> r There will be no gravel processing on site during Phases I <br /> and II . Materials will be excavated and hauled to the adjacent <br /> plant site. A portable crusher may be set up at a later date, as <br /> shown on the Mining Plan Map for Phases III , IV, and V. For the <br /> r entire operation, any water- requirements will be supplied from <br /> the well on the adjacent pit. <br /> r Permitted wells in the area are shown on Figure G-1 and <br /> listed on the following Table G-1 . These wells are not expected <br /> to be affected by operations. <br /> r Discharge from dewatering the site will be monitored in <br /> accordance with the discharge permit to be obtained by the oper- <br /> ator. Discharge will flow into the existing drainages at the <br /> ' locations shown on the Mining Plan Map. Riprap spillways will be <br /> installed at the dewatering discharge locations. After Phases I <br /> and II are dewatered, the pump will be relocated for dewatering <br /> r the remaining phases. Both of the existing drainages are capable <br /> of handling the water to be discharged. <br /> r <br /> r <br /> r <br /> 1 <br /> G-1 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.