Laserfiche WebLink
1 <br /> Fire lanes will not be required since the area will not be <br /> ' forested, No deposit or disposal of refuse is anticipated . No <br /> adverse chemical , physical or surface features are expected. <br /> ' The implementation of the reclamation procedures and misses <br /> proposed here will provide a pond with properly sloped and <br /> stabilized shorelines commensurate with the intended past-mining <br /> land use. The proposed seed miss will provide a near natural <br /> (native) plant community exhibiting species diversity and <br /> composition. <br /> ' Timetable <br /> ' Reclamation will be continuous throughout the mining apera- <br /> tion. As shoreline is created and mining progresses, LhP topsoil <br /> will be replaced along the banks and seeded as soon as practical . <br /> The first year, appro'ximately 2200 lineal feet of shoreline will <br /> be created and approximately 1400 feet per year thereafter. <br /> Width of shoreline for reclamation is calculated at 50 Meet. <br /> ' Final grading will be a 3h: 1v slope from the undisturbed area <br /> to 10 feet below waterline. <br /> ' Seeding, fertilization, revegetation and topsoiling have been <br /> previously discussed in this section. <br /> 1 <br /> 1 <br /> E-4 <br /> 1 <br />