Laserfiche WebLink
<br />STATE ~ <br />OF iiiiiiiiiiiiiiiiiii <br />COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Oepanmem of Natural Resources <br />131 3 Sherman 51.. Room 215 `y <br /> <br />Dcnvcr. Colorado 80203 ~ <br />~~ <br /> <br />Phone 00.)1866-3567 II <br />FAX: 13031 83 2-8106 <br /> DEPARTMENT OF <br /> NATURAL <br />August 9, 1995 RESOURCES <br /> <br />Mr. Marshall Butler Roy Romer <br /> cnvernor <br />Fremont County <br /> <br />615 Macon Avenue Room B-5 ~a mes 5. Lochheazi <br />E.ecuove Dueaor <br />Canon City, CO 81212 Michael g. LUng <br /> D ivisiun Dveclm <br />Re: M-94-116, Phantom Canyon Pit, Permit Issuance <br />Dear Mr. Butler: <br />On August 8, 1995, the Division of Minerals and Geology found Fremont County <br />to have satisfied the applicable requirements of C.R.S. 34-32-101 et seg. for <br />obtaining a mining and reclamation permit. Therefore, a permit is being <br />issued. Two signed originals of the permit have been executed. We have kept <br />one copy for our files and are enclosing one copy for your use. Please read <br />the terms of the permit. It is your responsibility to comply with all of the <br />terms of the permit. As a reminder, here are a few things we feel are <br />important. <br />1. All of the original application materials, as amended and supplemented, to <br />be an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1.10 to Conversions. <br />3. On your permit anniversary date each year, August 8, you must submit an <br />annual fee and an annual report to us. The annual fee for this permit is <br />5225.00. Please consult Rule 3.4 for 110 Permits, Rule 2.4 for 112 Permits, <br />and Statute Section 34-32-116(1)(a) for 111 Permits, for the specific annual <br />report requirements applicable to your mine. <br />If you h v ny questions, please contact me. <br />Si rel , <br />~ ~ q ~t r r~ <br />AEL B. LONG J <br />Division Director <br />Enclosure <br />