My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE107193
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE107193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:59:45 PM
Creation date
11/24/2007 2:51:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
10/14/2007
Section_Exhibit Name
2.05.5 Postmining Land Uses
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(~ Monitoring of established monuments and structures shall be performed at <br />• leas[~c uarterly, commencing one month prior to the initiation of mining beneath anv established monument or <br />structure. <br />least semi-annually. <br />(E) Results of the monitoring program shall be submitted to [he Division at <br />(F) The monitoring program shall be designed to extend for a time, beyond <br />cessation of mining an anv area, consistent with the need for verification of [he subsidence prediction. <br />(ii) The application shall include an appropriate map, prepared according to [he standards <br />of Section 2.10, showing the location of monuments to he installed and structures to be monitored within the <br />permit and adiacen[ area. <br />RESPONSE <br />Prior to panel development below the Twentymile Sandstone, a subsidence monitoring program will be <br />initiated to provide quantitative data regarding potential subsidence above underground workings. <br />Monuments will be installed [o a depth below the frost line, to avoid frost heave damage, and shall be <br />constructed to an approved standard. The location of monuments are shown on the five year mine plan <br />map, Map 23A. The monuments have been designed to fulfill the following requirements: <br />Above Main Entries <br />• Monuments have been installed at 100 foot intervals along the center line of the main entries in the <br />location of Foidel Creek. _ <br />The data gathered from the subsidence network installed over the main entries along Foidel Creek <br />demonstrates that subsidence has no[ occurred in [his area. Because of this, monuments FC-?, FC-3 and <br />FC-4 have been deleted from the subsidence monitoring plan. <br />Since subsidence has not occurred within the Foidel Creek Area, TCC does not intend to establish <br />monuments over main entries which will be driven under Fish Creek. <br />2. Above Production Panels <br />In reference to Ist Panel South, hvo lines of monuments have been installed as shown on Map 23A, Five <br />Year Mine Plan. The maximum spacing between adjacent monuments in the same line is 100 feet or <br />approximately 10% of the overburden depth. Spacing has been narrowed to 50 feet on the east side of the <br />panel to better define the angle of draw. One line will be along the centerline parallel to the long axis of <br />the panel. A second line will be transverse [o the long axis of the panel. The lines will extend beyond the <br />panel area to fully cover the area within [he maximum possible angle of draw. The steep cliffs formed by <br />[he Twentymile Sandstone may make some sites inaccessible. <br />As indicated by the semi-annual monitoring extraction area of I st Panel South. However. since the <br />extent of subsidence has stabilized, these monuments (SM-7 through SM-41, inclusive) will be deleted <br />. from the monitoring plan as of 1st quarter, 1989. <br />
The URL can be used to link to this page
Your browser does not support the video tag.