Laserfiche WebLink
<br />PROPOSED BOND REQUIREMENT FOR 7W0 ADDITIONAL SITES U AND T <br />Sealing Plugging <br />Abandonment Fluid Seal <br />10~/gal., 1 gal./ft. (.10 x 3500) S 350 <br />Fluid Equipment 320/hr. x 2 hrs. x 2 holes 80 <br />Labor @ S10/h r. x 4 hrs. x 2 holes 80 <br />Rig Time S70/man x 2 hrs. x 2 holes 280 <br />Water Truck @ 2 hrs./hole x 525/hr. x 2 holes 100 <br />2 Non-slip Plugs @ 51.00 each 2 <br />1 ft. Grout @ b5/ft. x 2 holes 70 <br />Labor @ E10/hr. x 2 man hrs./hole x 2 holes 40 <br />• <br />Regrading and Topsoil Distribution <br />2 hrs./site, 550/hr, x 2 sites 200 <br />Reseeding <br />50 x 50 ft. area x 2 sites 125 <br />Road Repair (Repair of inadvertent damage due to <br />overland access] <br />0.5 miles x 18 hrs./mile x 575/hr. _ 075 <br />_~02 <br />• <br />