My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE107121
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE107121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:59:41 PM
Creation date
11/24/2007 2:45:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995009
IBM Index Class Name
Permit File
Doc Date
3/24/1995
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RECLAMATION COST SUMMARY cont'd <br /> <br />sheet 4 of 4 <br />K. PORTAL/SXAFT SEALING <br />Task No.~ Task Description ~ Cost (f) <br />________I_________________________.~__....._______________.,I_______.__ <br />Subtotal (K ): <br />L. DRILL HOLE/MONITORING YELL SEALING <br />Task No.~ Task Description ~ Cost (f) <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description <br />Demolition <br />3 ~ Seeding ravage cost <br />Fencing <br />4 ~ Mob/Demob 1 d8 dozer <br />Subtotal (L): <br />Cost (f) <br />____________I__~________ <br />556,276 <br />I f800 <br />Subtotal (M ): 557,076 <br />------------ <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 584,277 <br />ll. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ <br />________I Item Description <br />~___._____~_____________________ <br />__________ ~ <br />_____.,I_ Cost (S) <br />___________ <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ 51,306 <br />2. ~ Contra[ tot's Performance Bond 0.975% of dir. ~ f822 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ f8,428 <br />4. ~ Job Superintendent.. <br /> Subtotal (A ): f10, 556 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 594,833 <br />B. DNG PROJECT ADMINISTRATION E%PEMSES <br />Item No.l Item Description <br />1. ~ Contract Prep., Eng. Fees..... <br />2. ~ Staff Adni n. Expenses......... <br />Cost (S) <br />______________I________.... <br />4.25% of cntr.~ (4,030 <br />0.75% of cntr.~ f711 <br />NET INDIRECT COST PERCENTAGE: 18.15% <br />Subtotal (B): f4, 742 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 515,297 <br /> <br />TOTAL PERFORMANCE <br />BOND AMOl1NT __ <br />(direct plus irxfi rec[ costs): __________ <br />599,574 <br />
The URL can be used to link to this page
Your browser does not support the video tag.