Laserfiche WebLink
~- . ~ III IIIIIIIIIIIII III !~ <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparlmeni of Natural Resources <br />1 J I 1 Sherman 51 , Room 215 <br />Denver, Colorado 80203 <br />Phone' 13031 866-3567 <br />FAY. (4031 A32-A 106 <br />March 4, 1994 <br />Mr. George Tempel <br />Mid-Western Farms <br />P.O. Box 246 <br />Wylie, Colorado 81092 <br />Re: M-93-059, Mid-Western Farms, Prowers County <br />Dear Mr. Tempel: <br />things we feel are important. <br />F <br />~~~ <br />DEPARTMENT OI <br />NATURAI <br />RESOURCE' <br />Foy Roma <br />Governor <br />Ken s.il.,n.v <br />Etec W ive Direnur <br />Permit Issuance ^i'c ha el B. LUng <br />Dn~siun Dnean, <br />On March 04, 1994, the Division of Minerals and Geology found Mid-Western <br />Farms to have satisfied the applicable requirements of <br />C.R.S. 34-32-101 et seg. for obtaining a mining and reclamation permit. <br />Therefore, a permit is being issued. Two signed originals of the permit have <br />been executed. We have kept one copy for our files and are enclosing one copy <br />for your use. Please read the terms of the permit. It is your responsibility <br />to comply with all of the terms of the permit. As a reminder, here are a few <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none has been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1.10 to Conversions. <br />Permits, and Statute Section 34-32-116(1)(a) for 111 Permits, for the specific <br />annual report requirements applicable to your mine. <br />3. On your permit anniversary date each year, March 04, you must submit an <br />annual fee and an annual report to us. The annual fee for this permit is <br />$550.00. Please consult Rule 3.4 for 110 Permits, and Rule 2.4 for 112 <br />If you have any questions, please contact me. <br />Sincerely, <br />MICHAE~\ <br />Division Director ~~ <br />MBI./dlm <br />Enclosure <br />~~ <br />cc: Tuttle Applegate, Inc. <br />8'64G <br />