My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE107082
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE107082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:59:39 PM
Creation date
11/24/2007 2:42:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Permit File
Doc Date
9/26/2007
Section_Exhibit Name
Part 816 Surface part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Doc Date:12/11/2001 III III I II I IIIIII III <br /> <br />Revised 04j20j90 <br />Section 816.99 Continued. <br />(b) At any time a slide occurs which may have a potential adverse affect <br />on public property, health, safety, or the environment, the person who <br />conducts the surface mining activities shall notify the regulatory <br />authority by the fastest available means and comply with any remedial <br />measures required by the regulatory authority. <br />At any time a slide occurs within the mine plan area which may have <br />a potential adverse affect on public property, health, safety, or the <br />environmental, Kerr Coal will notify the regulatory authority by <br />telephone and promptly implement any remedial measures required by <br />the regulatory authority. <br />• <br />I Section 816.100 Contemporaneous reclamation. <br />~1~ <br />Reclamation efforts, including, but not limited to, backfilling, grading, <br />topsoil replacement and revegetation, of all land that is disturbed by <br />surface mining activities shall occur as contemporaneously as practicable <br />with mining operations. <br />All reclamation activities including, but not limited to, <br />backfilling, grading, topsoil replacement and revegetation will be <br />carried out as contemporaneously as practicable with mining <br />operations. Implementation of the reclamation plan, as described in <br />Section 780.18, will assure that each step in the reclamation process <br />is completed in a timely manner. <br />Backfilling and Gradino <br />Reference to Map 33, Kerr Mine Area Overburden Replacement and <br />Grading, discloses that all remaining overburden to be removed from <br />ongoing mining in Pit 1 will be direct hauled within the pit for <br />backfilling in the southern and central pit areas. Approximately <br />600,000 BCY of <br />816-123 <br />j~ 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.