Laserfiche WebLink
<br />MINING PLAN <br />EXHIBIT B <br />The trees and willows will <br />hundred twenty (120) feet of the <br />removed from the west forty (40) <br />will be extracted from the forty <br />twenty five (25) feet working fry <br />east. <br />The gravel will be stock piled on the east eighty (E <br />that the trees and willows have been removed from. Morgar <br />will not extract more than seventy thousand (70,000) tons <br />The vegetation will be removed so as to maintain a forty <br />wide extraction area and eighty (80) feet stock pile area <br />mining of the permit area. <br />be removed from the west one <br />sight, then the over bur en will be <br />feet of the site and the gravel <br />(40) feet strip depth of the pit <br />~m north to south and fro west to <br />The north thirty (30) feet of the area will be to st <br />over burden. <br />The County will use a dozer, front end loader, padd] <br />scraper, dragline, sand screen and dump trucks in this ope <br />It is proposed that this pit will be used on a part <br />depending on the need for material. <br />The life of this pit is expected to be from six (6) <br />(8) years. <br />This operation will create a permanent ground water <br />operation will not require any water for dust control or M <br />the gravel. <br />feet <br />County <br />er year. <br />0) feet <br />uring the <br />ck pile <br />wheel <br />tion. <br />basis <br />eight <br />Lake. The <br />fishing of <br />