My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE106760
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE106760
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:59:23 PM
Creation date
11/24/2007 2:13:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991082
IBM Index Class Name
Permit File
Doc Date
12/16/1991
Doc Name
MEMO-FN M-91-082 ADEQUACY ITEMS
From
MLRD
To
ROLAND G OBERING
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.4..___~_ -_- --- <br /> <br />A <br /> <br /> <br /> <br />1 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />• • • <br />PRIMARY REVEGETATION SEED MIXTURE - BROADCAST RATI's5 <br /> <br />~"'~ ------ --------- -- <br />--SPECIES <br />---------------~ r r~~~ acre-- seeds/lb seeds/sc;ft <br />INTERMEDIATE WHEAT.~~' S,b° 7 97000 15.59 <br />PUBESCENT WHEAT. ~.>0 i° S"O 7 90000 14..46 <br />SMOOTH BROME ~~ w ~ 9 145000 13..31 <br />SIDEOATS GRAMA `~'U - ~~~ - -- 4 143000 13..13 <br />BLUE GRAMA S'= ~s~ ~ 1 711000 16..32 <br />ALFALFA, RANGER i-r ~ <br />; -1 210000 4 <br />82 <br />YELLOW SWEETCLOVERPS° } <br />s <br />~ .5 260000 . <br />2.98 <br />ANTELOPE BITTERBRU,~H~;~ ~3, <br />~.. 2 15000 .69 <br /> <br /> <br />~ 2b:fs 1671000 81.31 <br /> 7~. L <br />~~ .CS~L~V <br />~'~ ~~~ <br />~~ <br />~, ~~, ~. <br />MAN-MADE STRUCTURES: All man-made structures on the site will <br />remain as part of the sawmill operation unless the sawmill <br />operation ceases prior to the full revegetation of the pit. slopes. <br />In that case, the structures will be dealt with in accordance with <br />the owner's disposal of the land and in accordance with local <br />building codes. If the land is sold to a subsequent party prior to <br />completion of the reclamation program then the subsequent owner <br />will become responsible for the completion of the reclamation and <br />disposition of the buildings through a Succession of Operator <br />process. <br />SCHEDULING: Scheduling of the reclamation work will largely be <br />controlled by the timing of the creation of the growth medium. All <br />efforts will be taken to avoid reclaiming outside of the time <br />periods previously described. This will help to control dz~mages to <br />the reclamation work by severe thunderstorms in summer. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.