Laserfiche WebLink
Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Page 54 of 136 <br />0.750 <br />AVG. <br />0.900 <br />CAT HB)) <br />1.000 <br />GEN. <br />1.000 <br />AVG. <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -OC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4863 <br />Adjusted unit production: 460.04 LCY/hr <br />Adjusted fleet production: 1840.16 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.720/LCY <br />Total job time: 4.28 Hours <br />Total job cost: $5,673.77 <br />CIRCES Cost Estimating Software <br />