Laserfiche WebLink
Page 31 of 136 <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.750 <br />AVG.) <br />0.900 <br />CAT HB <br />1.000 <br />GEN. <br />1.000 <br />AVG. <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -OC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4443 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB THM E AND COST <br />552.35 LCY/hr <br />2209.4 LCY/hr <br />Fleet size: <br />4 Dozer(s) <br />Unit cost: <br />$0.600/LCY <br />Total job time: <br />0.59 Hours <br />Total job cost: <br />$776.68 <br />CIRCES Cost Estimating Software <br />