My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE106748
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE106748
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:59:23 PM
Creation date
11/24/2007 2:12:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Permit File
Doc Date
10/31/2014
Section_Exhibit Name
EXHIBIT 25 RECLAMATION BOND
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 24 of 136 <br />BULLDOZER WORK <br />Task description: _Regrade Old Shop Area at Empire Village <br />Site: Williams Fork Mines Permit Action: Permit Renewal 06 Permit/Job#: C1981044 <br />PROJECT IDENTIFICATION <br />Task #: 012 State: Colorado <br />Date: 9/6/2013 County: Moffat <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D10T - 10SU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />1 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C044 -012 <br />Total unit Cost/Hour: $331.45 <br />Total Fleet Cost/Hour: $1,325.80 <br />MATERIAL OUANTITIES <br />Initial Volume: 13,090 <br />Swell factor: 1.165 <br />Loose volume: 15,250 LCY <br />Source of estimated volume: Table 63; Map 26 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />150 feet <br />1,243.2 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />5% <br />5,400 feet <br />2,900 lbs/LCY <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$110.68 <br />NA <br />Operating Cost/Hour: <br />$183.36 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $331.45 <br />Total Fleet Cost/Hour: $1,325.80 <br />MATERIAL OUANTITIES <br />Initial Volume: 13,090 <br />Swell factor: 1.165 <br />Loose volume: 15,250 LCY <br />Source of estimated volume: Table 63; Map 26 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />150 feet <br />1,243.2 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />5% <br />5,400 feet <br />2,900 lbs/LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.