Laserfiche WebLink
Page 13 of 136 <br />Agency or organization name: DRMS <br />UNIT COSTS <br />Borehole <br />Sealing/Item <br />Description <br />Method <br />Diameter <br />Length <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Cost <br />Bottom Plug - <br />PVC plug - 2 in. <br />2" <br />NA <br />11.00 <br />EA <br />$20.59 <br />$226.49 <br />2 "Wells 11 <br />diameter borehole <br />- Fill Holes <br />Portland cement <br />2" <br />NA <br />62.00 <br />bag <br />$11.50 <br />$713.00 <br />with Cement <br />grout ( Bag, material <br />cost only ...94 lb. bag) <br />- Cut Casing <br />Exposed casing <br />2" <br />NA <br />11.00 <br />LF <br />$1.33 <br />$14.63 <br />at Surface <br />removal - 2 to 3.5 in. <br />diameter steel pipe <br />F <br />- Borehole <br />Borehole <br />NA <br />NA <br />11.00 <br />EA <br />$2.81 <br />$30.91 <br />Marker <br />location/identification <br />marker (EA, material <br />cost only) <br />Bottom Plug - <br />PVC plug - 4 in. <br />4" <br />NA <br />3.00 <br />EA <br />$28.45 <br />$85.35 <br />4 "Wells 3 <br />diameter borehole <br />- Fill Holes <br />Portland cement <br />4" <br />NA <br />96.00 <br />bag <br />$11.50 <br />$1,104.00 <br />with Cement <br />grout ( Bag, material <br />cost only ...94 lb. bag <br />- Cut Casing <br />Exposed casing <br />4" <br />NA <br />3.00 <br />LF <br />$5.87 <br />$17.61 <br />at Surface <br />removal - 4 to 6 in. <br />diameter steel pipe <br />F <br />- Borehole <br />Borehole <br />NA <br />NA <br />3.00 <br />EA <br />$2.81 <br />$8.43 <br />Marker <br />location/identification <br />marker (EA, material <br />cost only) <br />Bottom Plug - <br />PVC plug - 6 in. <br />6" <br />NA <br />5.00 <br />EA <br />$51.44 <br />$257.20 <br />6 "Wells 5 <br />diameter borehole <br />- Fill Holes <br />Portland cement <br />6" <br />NA <br />502.00 <br />bag <br />$11.50 <br />$5,773.00 <br />with Cement <br />grout ( Bag, material <br />cost only... 4 lb. bag) <br />- Cut Casing <br />Exposed casing <br />6" <br />NA <br />7.50 <br />LF <br />$5.87 <br />$44.03 <br />at Surface <br />removal - 4 to 6 in. <br />diameter steel pipe <br />(LF) <br />- Borehole <br />Borehole <br />NA <br />NA <br />5.00 <br />EA <br />$2.81 <br />$14.05 <br />Marker <br />location/identification <br />marker (EA, material <br />cost only) <br />Bottom Plug - <br />PVC plug - 8 in. <br />8" <br />NA <br />2.00 <br />EA <br />$70.47 <br />$140.94 <br />8 "Wells 2 <br />diameter borehole <br />- Fill Holes <br />Portland cement <br />8" <br />NA <br />402.00 <br />bag <br />$11.50 <br />$4,623.00 <br />with Cement <br />grout ( Bag, material <br />cost only ...94 lb. bag) <br />- Cut Casing <br />Exposed casing <br />8" <br />NA <br />4.00 <br />LF <br />$8.81 <br />$35.24 <br />at Surface <br />removal - 8 to 14 in. <br />diameter steel pipe <br />F <br />- Borehole <br />Borehole <br />NA <br />NA <br />2.00 <br />EA <br />$2.81 <br />$5.62 <br />Marker <br />location/identification <br />CIRCES Cost Estimating Software <br />