Laserfiche WebLink
• 3. Followup Recommendations: <br />a. Check portal diversion projects with largest indicated <br />dump attenuation for understanding mechanics (i.~. are <br />the metals being retained and is the dump the key or is <br />it oxidation). <br />b. Gather information on portal candidates for bulkheads. <br />c. Check water bath analysis for sensitivity to dilution <br />ratio and exposure time. <br />d. Quantify groundwater and surface water flow effects on <br />sites noted to be affected if it is econort~ically <br />feasible. <br /> <br />• _ 7 _ <br />