My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE106665
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE106665
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:59:19 PM
Creation date
11/24/2007 2:04:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004047
IBM Index Class Name
Permit File
Doc Date
7/25/2004
Doc Name
New 112c Appl
From
Farfrumwurkin LLLP
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.4.12 Exhibit L -Reclamation Costs <br />• A significant amount of the reclamation will occur concurrently with mining and <br />therefore that portion of earthmoving has not been included in calculation of the <br />bond amount. There will be no more than 100,000 yd3 of overburden and topsoil <br />stockpiled at any given time. The costs table shown below is based on the single <br />largest area open <br />DIRECT COSTS <br />• <br /> <br />NO. <br />TASK DESCRIPTION <br />TASK HOURS DIRECT <br />COST <br />001 Backfillin 8 Slo a Gradin 0.5:1 TO 3:1 75 $8.953.50 <br />002 To soil re lacement NA $26,390.00 <br />003 De-waterin filled it NA $2,262.00 <br />004 place compacted clav liner material to $0.80Icv NA $30,960.00 <br />005 Cla liner moisture conditionin , blendin radio ,etc. NA $3,870.00 <br />006 Cla liner QAIOC NA $1,277.10 <br />007 Re-ve elate areas surroundin excavation NA $13,216.00 <br />008 Mobilization/ Demobilization of Reclamation E ui ment NA $1,000.00 <br />SUBTOTALS 75 $87.928.60 <br />TOTAL DIRECT COST = $87.928.60 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />009 Liabili insurance 1.55% of direct costs $1,362.89 <br />010 Performance bond 1.05% of direct costs $923.25 <br />011 Job su erintendent costs, 5.5 hrs $33.88/hr $186.34 <br />012 Profit 10% of direct costs $8,792.86 <br /> TOTAL O&P = $11,265.34 <br /> CONTRACT AMOUNT <br />(direct+O&P) _ $99,193.94 <br />PROJECT MANAGEMENT <br />13 En ineerin work and/or contracUbid re aration 4.25% of contract. $4,215.74 <br />014 Reclamation mana ement and/or administration 5% of contract. $4,959.70 <br />TOTAL INDIRECT COST = $20,440.78 <br />TOTAL BOND AMOUNT = $119,634.73 <br />u <br />112 DMG Permit Application <br />Page 20 of 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.