My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE106618
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE106618
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:59:17 PM
Creation date
11/24/2007 2:00:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
SEDIMENTATION POND DESIGN
Section_Exhibit Name
EXHIBIT 29
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 9 - <br />• tests are also presented on these figures. A standard Proctor <br />moisture~lensity determination, performed on a sample of the slightly <br />sandy clay, is presented on Fig. 22. Undrained, quick direct shear <br />test results on a remolded sample of the clay (Fig. 23) indicates the <br />following shear strength: <br />Angle of Internal Friction Cohesion <br />15° 1,300 psf <br />Considering the subsurface conditions encountered in our test <br />pits, our experience with similar soils, and the size of the proposed <br />etnbanlrnients, we rewmmend an embanlanent section wnsisting of a <br />homogeneous o~act~ earthfill. Typical embanlanent section and <br />details are presented on Fig. 18. The e~nbanlrnient section was <br />determined by considering the available material, maintenance and <br />~ ~1,. <br />stability of the embanlanent slopes. ~ a ~ >'9nN ~~r~ ~,.,, kz r~ <br />e <br />Embanlanent slopes of 3:1 and 2.5:1 are recotmnended for upstream <br />_ _ `_. <br />and downstream slopes, respectively. The central lower portion of the <br />embankment should be excavated into the natural grade to form a <br />minimal cutoff trends with the dimensions shown on Fig. 18. <br />Dewatering may be required in the key trench excavation of Rind E <br />during construction. <br />The material placed in the ®nban]cment should be an impervious <br />soil with at least 608 passing the U.S. No. 200 sieve. All fill <br />should be compacted to at least 95$ standard Proctor density near <br />optimum moisture content. Foundation treatment should consist of <br />C~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.