Laserfiche WebLink
TABLE I-5 <br />ACRES OF SOIL DISTURBANCE <br />Topl Acra Disturbed Total Acrea of Fn Ile Soib platurbed <br /> Temporary <br />Construction <br />Disturbance <br />Mining <br />O eratlons <br />Long-Term <br />Disturbance <br /> <br />Total Temporary <br />Construction <br />Disturbance <br />Percent of <br />Study Aree <br />Mining <br />Operatlona <br />Percent of <br />Study Aree <br />Long-Term <br />Dttturbantt <br />Percent of <br />Study Area <br /> <br />Total <br />Piceance Site 219 483 72.2 774.2 213 5 470 I2 35.2 <I 718.2 <br />Pipeline 267 -- -- 267 165 8 -- -- -- -- 165 <br />Parachute Site -- -- 56.3 56.3 -- -- -- -- 7 2 7 <br />Total 486 483 128.5 1097.5 378 13 470 12 42.2 <3 890.2 <br />• <br />• <br />716).nuT11-1 %L9 11/lvwp 11 PMyaPfN Sheet 1 of I <br />